Project Execution
From Factory Acceptance Test to Site Acceptance Test
Each customer project is handled by a dedicated Project Manager, who is the first level of contact to the customer team. Quality and times lines, as well as project status reporting, are the main focus in addition to risk management, resource management and cost control. Guided by our dedicated team of lead engineers, experienced manufacturing teams complete the assembly, manufacturing and commissioning tests during FAT/SAT, ensuring the high level of quality required by pharmaceutical industries. During the execution phase all relevant manufacturing and commissioning test documents are prepared and approved by the customer before handover together with a compressive documentation package.
Typical tasks and deliverables during Project Execution:
• Project Management
• Assembly and Manufacturing
• Commissioning and Qualification
• Factory Acceptance Test (FAT)
• On-Site Installation
• Site Acceptance Test (SAT)
Discover our Project Phases:
Our Integrated Solutions Team develops and implements rapid and cost-effective biomanufacturing solutions from early phase development through scale-up to commercial manufacturing.